Spread thin set along the first section of your tile row.
Tile shower door installation.
Place end caps on the tops of the wall channels.
Tap a plastic anchor into the pre drilled holes in the tile image 3.
Put it in place and tape it down until the side rails are in place image 2.
The shower tiling alone will take two days.
Continue reading below our video of the day.
Drill proper holes into the walls for the side rails.
Our shower doors are customized for your space so having a new one ordered fabricated and delivered could take up to 3 weeks.
Measure the inside width of the shower at the top surface of the tub ledge from wall to wall.
How to tile a shower like we show here will take you about four full days.
Make sure that all of your measurements are level and figure out exactly where the hinges for the door will be going.
Turn over the trowel to the notched side and comb over in one direction.
Run a bead of silicone on the underside of the threshold piece image 1.
Make a mark on the tile for the spots where you will be drilling.
If you want fancy glass tile accents like the ones we show brace yourself.
Attach the door handles and any towel bars.
Clean the tile surface with a household cleaner to remove any film or dirt from the tub ledge and tile surfaces.
Place the glass clamp sweep into place on the door s bottom edge and secure it at the door clamp.
Use a hacksaw to.
How to install shower doors on tile step 1.
Run a damp sponge over the backer board in the area you intend to tile.
However the actual installation of your new shower door can be completed by our professional installers in 2 3 hours.
Attach the seal strip to the bottom of the door and cut it to the required length.